Newmarket Lane project

Newmarket Lane project

Project Details
Project
Newmarket Lane project
Location
Newmarket Lane, Wakefield
Get in touch about your next project
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Why Choose us

Highway & Roundabout Construction at Newmarket Lane - Designed to accommodate future traffic increases resulting from the construction of a new Amazon Warehouse and nearby industrial units. Engineered for long-term durability and efficiency, ensuring smooth traffic flow in a growing commercial area.

Earthworks – Cut & Fill Operations - Extensive cut and fill operations to shape the highway to the required levels, ensuring accurate tie-in to the existing road network. Using advanced 3D machine control technology, utilizing a custom-built model that we designed in-house to ensure precision and efficiency throughout the project.

Drainage Systems Installation - Setting out the new deep drainage systems implemented to manage both foul and storm water.

Ducting Installation - Laid new ducting systems to accommodate essential utilities, including electrical and communication cabling, ensuring future-proof infrastructure.

Kerbing Installation - Precision installation of kerbing for the new highway and roundabout, creating safe and defined road edges for vehicle and pedestrian use.

Comprehensive Quality Assurance Data Records  - Conducted detailed inspections and documentation of all completed works to ensure compliance with project specifications and industry standards. Maintained accurate records of materials used, measurements, and construction processes to verify the quality and integrity of each phase.

Latest Projects