Collingham Bridge Construction

Project Details
Project
Bridgewood Green, Leeds Rd, Collingham
Location
Bridgewood Green, Leeds Rd, Collingham
Get in touch about your next project
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Why Choose us

Delivery of a new bridge and retaining structure for the Bridgewood Green Development in Collingham for Miller Homes. The project involved temporarily diverting Collingham Beck to facilitate the construction of the new structure, along with widening a section of the A58 to improve access to the development.

 

  • 3D Machine Control Model for Beck Diversion Earthworks
    Developed a precise 3D Machine Control model to guide the earthworks for the diversion of Beck, ensuring accurate excavation and material placement.
  • Piling Setout for Bridge Construction
    Provided accurate setout of the piling locations for the bridge, ensuring structural stability and alignment of the foundations.
  • Insitu Reinforced Concrete Setout
    Set out for the placement of reinforced concrete for key bridge elements, including the base, abutments, and wing walls, to guarantee structural integrity and proper formwork.
  • Supervision of Utilities Installation in Bridge Deck
    Oversaw the installation of utilities (water, electrical, telecom) within the bridge deck, ensuring compliance with design standards and safety regulations.
  • Setout for Retaining Sheet Piled Wall (A58 Road Widening)
    Set out the positions for the retaining sheet-piled wall, enabling the road widening works on the A58 Leeds Road.
  • Site Engineering for Road Widening Works (A58)
    Conducted comprehensive site engineering services for the road widening project, managing drainage, utility installations, and the complete road construction process up to final surfacing.